Aquarius Condominium 2751 South Ocean Drive Hollywood, FL
North Tower on the right and South tower on the left, 18 stories high.
This project was concrete restoration, stucco, replace swimming pool, pavers, and painting.
Reconstruction of the Swimming Pool to a "wade in swimming pool"
Plaza Deck Concrete Restoration
New Plaza Deck and Swimming Pool
South Tower East Elevation Delaminated Stucco and Concrete Repairs
South Tower East Elevation Completed Stucco and Concrete Repairs
Plaza Deck Slab Repair
Beam Concrete Repairs
West Wall of South Tower with delaminated stucco removed and numbered for quantification.
West wall of South Tower completed with new new concrete, stucco, and paint.
South elevation of the South building with concrete restoration
South elevation of South building completed
Courtyards of the Grove 2924 & 2930 Day Ave and 3242 and 3240 Mary Street Coconut Grove, FL
4 buildings 4 stories high 180 feet long
2 South Buildings
Beginning of construction. Pavers removed to begin concrete restoration.
Sonia in white shirt overseeing paver removal.
Finished plaza deck concrete restoration, delaminated and cracked stucco removal and replace, remove and replace of old expansion joints, paint, deck coatings, and reinstall clay pavers.
Interior of North building completed
All Pavers Lined Up Nice and Pretty Down the Wall for Reinstallation
27,000 Nicely Stacked Clay Pavers for Re-install
Complete Removal of Landscaping and Sandbed.
Topping slab is lightweight concrete and seen here as yellow in color
A lot of cleaning of the 10,000 SF plaza deck structural slab.
With 10,000 SF of topping slab removed and cleaned,
we can now layout new drain locations based on a topographical survey
Cracked column on second floor of southwest stairs
Roots Grown Between Topping Slab and Structural Slab
Drain Removed From Deteriorated Structural Slab Providing Easy Assessment of Slab Thickness, 3.5"
32 Structural Slab Repairs Due to Rusted Existing Drains and Surrounding Spalling Concrete to Parking Garage Below
Mid Beam to Mid Beam with Cross Stitching for Structrural Slab Repair without Existing Rebar.
3.5" Structural Slab with welded wire mesh.
Cracked Beam From Oxidation of Reinforcing Steel
Initial Concrete Removal of 37" High Cracked Beam Indicates Oxidated Reinforcing Steel Spalling Concrete.
Exposure of Reinforcing Steel
Treated Reinforcing Steel With Rust Inhibitor
Beam Repaired with BASF MasterEmaco N 420
Beam Repair Due to Full Length Crack of 27"
Stucco Cracked Due to Failure of CMU Mortar Joints. CMU failure without Reinforcing of Opening. Previously Pathched by Others With an Elastomeric
Most All Stucco Repairs Were at the Bottom Corners of the Windows Due to No Reinforcing Steel or CMU Grout Filled Cells Around Opening Perimiters
Horizontal Stucco Repair Necessary Without CMU seated on a Recessed Slab Edge.
Poor Construction of Expansion Joints. Plywood in Joint with Wire Lath Metal Bead for Stucco Application. All Expansion Joints had to be Rebuilt.
Joints Cleaned and Backer Rod Inserted for use of Sealant.
All Expansion Joints Rebuilt for Proper Stucco Application. Styrofoam Board Used to Create Joint.
Expansion Joint is Prepared for Sealant.
Planter Curb Layout and Install
New Planter Curbs Installed
Topping Slab Install in Planters
Topping Slab Install After Drain Relocation Based Upon Topographical Survey.
Overhead Concrete Removal of Walkay Showing Rusted Electrical Conduit
Overhead Walkway With New Stucco Repair Due to Spalling Concrete
Cracked Third Floor Landing Due to Failed Concrete
Cracked Columns on Exterior Side of Third Floor SW Stairs
Removal of Delaminated Stucco to Garage Entrance
Delaminated Stucco Repair of Garage Entrance
Treated Beam Embed Rebar
2" Concrete Cover Over Treated Embeds of Beams in Garage
Vertical Concrete Repairs in Pool Pump Room
Overhead Concrete Repairs in Pool Pump Room
Existing Condition of Cracked and Broken Concrete Thresholds
New Doweled Steel Reinforced Concrete Thresholds For All Doors on the First Floor of North Building.
TREMproof® PUMA (polyurethane-methacrylate) waterproofing system applied to the planters first.
PUMA (polyurethane-methacrylate) waterproofing system applied to the 10,000 SF slab.